hey blog fans. short post this week. most of the plywood sheathing is up. this not only protects the house from weather, but is actually structural as well, taking much of the shear loads. well, whatever's left that isn't dealt with by our many metal shear wall panels that the engineer specified. next week walter will begin framing on the roof. i think that will be a bit shocking, as i've gotten quite used to our low-profile flat box.
above is a collaged view of the main space from the kitchen toward the fireplace wall. we're installing a vent-free gas fireplace, so no chimney required. as such, it will be surrounded by glass.
above is the view from the driveway approaching the garage.
above is the garage, which is under the den and entry hall, which is under the covered roof deck. you can see that the land is still a few feet shy of reaching the front door. we're still working out the details for the front steps.
above, the view from the backyard.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment