walter also started backfilling the area around the foundation, although this picture isn't the best evidence.
at the far end of the photo, you'll notice that there are no walls on the second floor - this will be the outdoor living room, complete with ipe floors and ceiling and a cable railing.
in this shot from the backyard, you can see the window openings on the second floor. we used a standard 3' wide by 4' tall window unit in all the upstairs rooms. here's the layout, from the left...
- first set of double windows is in the master bedroom
- second set of double windows is in the master bathroom
- the next two single windows are in one of the guest rooms
- the final set of double windows is in the other guest room
this shot shows the front of the house from across the driveway (the white trailer is in the driveway). again, the insulating foam is visible. additional fill will be brought in such that all of the insulation is covered.
hi walter.
we'll update again next weekend, when we hope to have the interior walls on the second floor framed.
No comments:
Post a Comment